Inspection Data Entry Form

User Guide — How to Fill the Inspection Form (tap to open)
  1. Inspector: your name is filled automatically from your login.
  2. Line & Unit: pick the Line Number first — the Production Unit fills in automatically. Then choose the Section.
  3. Bundle / Work Order: tap Scan with camera and hold the bundle-ticket QR in the centre box, or type WO / Cut / Bundle / Sr / Qty by hand.
  4. Operator: tap Scan with camera and scan the operator's QR card (keep it in the centre of the frame). Name, Employee ID and Designation fill in automatically. Inactive operators cannot be selected.
  5. Machine & Operation: type to search, then select. The Skill rating auto-fills from the operation.
  6. Faults: for each defect choose the Fault Name, pick a Severity, and enter the Fault Count and Altered Pieces (a fault's Altered Pieces can be 0). The Altered Pieces of the entry (section 6) can never be more than the total Fault Count, and must be at least 1 when there are defects. Use Add Another Fault for more than one defect.
  7. Round & Shift: set the round number and shift. Checked Pieces defaults to 7 (or the bundle quantity if smaller) — change it if you checked a different number.
  8. Reset Form clears the entry but keeps your Inspector details and Line / Unit / Section until you refresh the page or sign out.
  9. DHU % is calculated automatically as (Total Defects ÷ Checked Pieces) × 100 — Total Defects is the sum of the Fault Counts.
  10. Reworking: tick Reworking before saving to reject the bundle. It then goes to the Reworking form (header button) for re-inspection and is blocked on this form until it passes OK.
  11. SBU-A Front / Back: a bundle can be entered in Front or Back (either order) only after it has been scanned in the SP section. SBU-B is not restricted.
  12. Press Save Inspection Entry. All required fields must be filled; a duplicate (same operator, date, line and round) is blocked — except for SBU-A, where the entry is saved with the round as entered.
  13. Tip: hold QR codes steady in the centre square for the quickest scan.

1. Inspector Details

2. Unit, Line & Section Assignment

3. Bundle & Work Order Scanning

BUNDLE

4. Operator

OPERATOR

5. Quality Defects, Machinery & Operation Details

Total Faults (Auto-calculated)

Sum of all fault counts below

0 Total Faults
0 Altered Pieces

6. Production Metrics, Round, Checked Piece, Altered Pieces & DHU%

7. Measurement

Validation Rules & Instructions:

  • All LOV dropdowns (Units, Lines, Sections, Machines, Operations, Faults) are fully populated from the master database.
  • Incomplete entries will not be saved (all required fields must be completed).
  • DHU% is automatically computed as (Total Defects / Checked Piece) * 100 (Total Defects = the sum of the Fault Counts).

Inspector Summary

Inspector Bundles Rejected Bundles Rejected Bundles % Bundle Qty Checked Pcs Total Defects DHU %

Bundle Qty = sum of bundle quantity of distinct bundles (WO + Cut + Bundle) scanned by the inspector on this date. Inspectors see their own row; supervisors see every inspector. Section Closed entries excluded. Rejected Bundles = bundles with at least one altered piece; Rejected Bundles % = Rejected ÷ Bundles × 100. Total Defects = sum of the Fault Counts; DHU % = Total Defects ÷ Checked × 100 (limit 10%).

Notification